Delivering the next generation of metals projects into production

BMC (UK) LIMITED is a private UK-based resources development company.

BMC is engaged in the assessment, acquisition and development of base metals projects which have robust economics and deliver long term benefits to the local communities within which they operate.

BMC through its 100% owned subsidiary BMC MINERALS LTD, is currently developing the Kudz Ze Kayah Project, in south east Yukon, Canada. The project is expected to operate for a minimum of 10 years producing high grade zinc, copper and lead concentrates with significant gold and silver credits. The project is progressing through the Yukon Environmental and Socio-economic Assessment Board process with production scheduled for 2026. A Feasibility Study Summary about the project published in 2019 is available, with an Updated Feasibility Study Technical Report effective November 2020 and revised Feasibility Study Summary dated November 2020 available on Report links below.

Latest Announcements

Read our latest news, updates and publications that provide information about BMC’s Sustainability commitment and the KZK Project 2024 Drill Results.

All BMC and KZK announcements are listed under News.

Bmc Esg Report Cover

BMC October Newsletter

Bmc, Kzk Newsletter, October 2024, 31st Edition Page 1 Resized

Latest News

BMC Minerals, Sustainability Report 2021-2023 ‘Leaving a Positive Legacy’

For the Period 1 July 2021 – 30 June 2023

12th December 2024 – BMC Sustainability Report Released

BMC MINERALS LTD (“BMC” or the “Company”) is pleased to present the BMC Minerals Sustainability Report (“Report”) ‘Leaving a Positive Legacy’, a biennial report for the period 1 July 2021 to 30 June 2023. It […]

28th November 2024 – BMC Minerals Reports Additional High-Grade Drill Intersections Within Newly Identified Mineralized Zones Near the Proposed ABM Mine, KZK Project Yukon

BMC is pleased to advise that assay results from the remaining drill holes in the recent exploration drilling program at its 100% owned Kudz Ze Kayah (KZK) Project in Yukon, Canada have been received. The […]

8th November 2024 – Exploration Drilling Discovers New Mineralized Zones Near the Proposed ABM Mine, KZK Project Yukon

BMC is pleased to advise that the recent exploration drilling program at its 100% owned Kudz Ze Kayah Project in Yukon, Canada, has identified two new zones of high-grade massive sulphide within 1.5km of the […]

In The Media

When clicked, this video is loaded from YouTube servers. See our Privacy Policy for details.

Yukon Geoscience 2022, BMC KZK Project update

BMC CEO, Scott Donaldson gives a wrap-up presentation at YCM GeoScience Speakers Series which BMC proudly sponsors.

When clicked, this video is loaded from YouTube servers. See our Privacy Policy for details.

BMC Kudz Ze Kayah Project flyover 2022

Community Relations

BMC’s community philosophy is simple:

  • Invest real money in the ground with local involvement
  • Advance BMC projects while being sensitive to local matters
  • Expand resources with development and step out drilling
  • Final design and operating philosophy at all stages to be responsibly designed and to leave a positive legacy

That philosophy is based on a series of solid commitments, and an understanding of the actions we need to take to deliver real outcomes:

RRDC TK Workshop April 2017 (2)reduced

BMC Kudz Ze Kayah Technical Reports

Bmc Esg Report Cover

BMC Sustainability Report 2021-2023

BMC Minerals, Sustainability Report, for Period 1 July 2021 to 30 June 2023, available on the link below.

BMC Minerals Sustainability Report 2021-2023 →
Esg 2020 21 Cover Only

BMC Sustainability Report, 2021

BMC Minerals, Sustainability Report, for Period Ending 30 June 2021, available on the link below.

BMC Sustainability Report 2021 →
Bmc Kzk Fss Final Cover Only Image Sm

Kudz Ze Kayah, Silver – Zinc Project

BMC, KZK Feasibility Study Summary, full report available at the link below.

BMC KZK Feasibility Study Summary, 30 November 2020 →
Ni 43 101, Dfs Technical Report Update, Cover

NI 43-101 Technical Report

BMC KZK Project NI 43-101 Technical Report is available at the link below.

R375-2020-NI-43-101-Technical-Report-KZK Project November 2020 →
Code Snippet ma-gdpr-youtube 1.5.0